An exciting aerospace project with some unique features and some special conditions for our client EGYPTAIR. Delivering and installing a flight simulator to the EGYPTAIR training academy.
EGL Scope
-Receiving Cargo at Port Said west Port (6x20DC + 3X40FR)
-Arranging Custom Clearance & releasing cargo in 48 hours.
-Delivering the cargo to the site at Cairo International AirPort.
-Off-loading the cargo at EGYPTAIR training academy.
-Rigging equipment for installation of the simulator, which continued for 15 consecutive days due to the cargo’s sensitivity.
The most critical part of this project was avoiding all of the obstacles during the delivery due to the cargo’s height restrictions which is 5.7-meter. Our excellent project team has made a unique route survey considering the cargo’s sensitivity all the way to Cairo airport with some bypasses avoiding all obstacles. Adding to that, the most vital part was the off-loading After careful study of the situation, our engineering team set a plan in motion to unload the simulator, using the necessary equipment and taking into consideration all the required safety procedures.
We feel very fortunate to be working and supporting EGYPTAIR in critical times