We believe any challenge, no matter how big or small, is better tackled as a team ????????☄️✅
We have managed to move the Longest ever beams moved inside Cairo city, The 85 meters length, 135 tons weights, 3.5 meters high were moved by EGL skilled crew by using hydraulic modular turntables 16 axles lines per each modular from Alexandria city to Cairo 5th Settelment to fly over the monorail line.
Beam lenth 75M
Beam Weight 1.3
Beam Height 3.5
Beam weight : 135 Ton
The main challenge was the very limited time to install the beams due to the road closer during the holly month of Ramadan and the movement with the buses in Cairo with such a giant shipment in one of the most cities with heavy traffic in the world during rush hours.
EGL used 2×8 axls lines Goldhover modular with 2×300 tons turntable and 2 Mercedes 4×8 Prime Movers.
Keep moving forward EGL ????????????????