Location:  New Abu Qir Substations, Alexandria
Client:     SIEMENS Technologies SAE  
EGL scope of work:  Jacking and Skidding of three transformers


On the 27th January, 2020 Egyptian Global Logistics (EGL), completed jacking/skidding of 3 transformers (116 tons each) for SIEMENS in Abu Qir Substations.  

The site was located about 60 km from Alexandria city. It was a quite challenging operation which was performed and completed despite the difficult conditions. One of the most difficult was that the transformers had to be rotated 90 degrees before being installed on the foundations. Operation area was only 6.5 meters (width) without ground pulling eyes.

Thanks to EGL Project Team for cooperation. EGL continues to impress the market with the well-trained staff along with the latest fleet equipment and technology in Egypt. EGL achieved this success through careful planning without sacrificing safety aspects.

EGL SUCCESS STORIES

We believe that Integrity and strong partnerships will produce success and flourish the business

200+ Project

over Egypt

A lifetime knowledge with project logistics. This knowledge comes from moving a broad range of industrial parts, power plants and commodities such as raw materials and finished products.

 

EGL offer multimodal door-to-door transports with cost-benefit and feasibility studies to facilitate our reliable, cost-effective and safe transport and logistics solutions. Adding on that, we provide route & site surveys and handle documentations with authorities.

Related Services

Have a question?

Get in touch with us today

Subscribe
to our newsletter

@2023 EGL. All Rights Reserved. 

Any question? Let us help you. Call us: +02 03 4859990

Get a Quote